Panama Canal waiting times have reached seven days for Southbound Panamax Plus non-booked vessels (information from 28th June 2021). See below for the full information on the current backlog from the Panama Canal Authorities:

DRAFT RESTRICTIONS
PANAMAX:
Max Draft: 12.04 meters (39.5 feet = 39 feet 6 inches) in the deepest point of immersion in Tropical Fresh Water (TFW) permitted for particular vessel in Gatun Lake. Water Density of Gatun Lake is 0.9954 at 29.4ºC (85ºF).
NEOPANAMAX:
15.24m (50.0 feet) Tropical Fresh Water (TFW) since June 9th, 2021
*Remarks:
– Regular: Vessel with beam<91 feet
– Super: Vessel with 91 feet<=beam<=107 feet
– Neopanamax: Vessel with beam>107 feet
– Panamax Plus: Vessel with 91 feet<=beam<=107 feet, but draft>39.5 Feet (12.04m) TFW
YOUR VESSELS, OUR PORTS
Do you have questions about Panama Canal waiting times? Or do you have vessels in Panama and need someone to solve shipping problems before they have even happened? Contact MasOceans SA and together with our local partners in Panama, Capas E.E.V., your port calls will run smoothly.
Capas is our partner in Panama for your port calls in: Bahía Las Minas (Terminal Granalera & Chevron), Colón 2000, Colón Container Terminal, Oil Tanking, Manzanillo International Terminal, Melones Oil Terminal, P.P.C. Balboa & Drydock MEC, Patsa & Potsa, PPC Christóbal & Telfer Tanks, PSA, PTP Charzo Azul, PTP Chiriquí Grande, Taboguilla.
Book a port with Martaxelle Erussard | martaxelle@masoceans.com | +41 (0) 22 552 00 51


Recent insights
Panama Canal | Transit Capacity and Booking Update
Aug
Gatun Lake | Water levels remain well above the 2023-2024 crisis period
Aug
94 Seconds | When Timing Is Everything
Aug
Panama Canal | Neopanamax draft restriction update
Aug
Ceuta Port Update | Operations Remain Unaffected
Aug
China Weather & Port Update | Week of 29 July
Jul
Middle East Maritime Security Update | JMIC Note 077
Jul
China Shipping Update: Market Signals Worth Watching
Jul